Skip to content
ORELSIS
Glossary

What is RTO / RPO (Recovery time and recovery point objectives)?

RTO defines the maximum time a system may take to be back in service after an outage; RPO defines the maximum amount of data loss that is acceptable.

In short

RTO defines the maximum time a system may take to be back in service after an outage; RPO defines the maximum amount of data loss that is acceptable.

For example, with an RTO of 2 hours and an RPO of 15 minutes, the system must be back within 2 hours and lose at most the last 15 minutes of data.

These objectives directly determine backup frequency, the need for a secondary site and the cost of the disaster recovery plan.

Let's digitalise your operations together.

In a 30-minute call, we'll listen to your needs and show you the right OREL products live.